![]()
This past summer the School District undertook a paving project to improve the parking areas in the front and rear of the school building. The front parking lots were resurfaced. The back parking lot was a more extensive project with removal of the existing surfacing and using a reclamation process to reapply the asphalt. An improved drainage system in the back parking lot was also part of the paving project.